The Westport Conservation Commission will conduct a site visit for orientation purposes only on Monday, September 19, 2011 at 9:00 a.m. to the following properties:
1. 25 Ford Road: Application #IWW,WPL-8880-11 by David Fioreck, PE, LEP of Loureiro Engineering Associates, Inc. on behalf of Thomas M. Sinchak, Esq., 25 Ford Road LLC for environmental remediation consisting of shallow excavation, placement of a flexible membrane liner, backfill and restoration to the existing contour lines. In selected, limited areas, there will only be excavation and backfilling. Portions of the work are within the upland review area setback, the WPLO area and 25-year floodplain of the Saugatuck River.
2. 2 Lyndale Park: Application #IWW,WPL-8888-11 by Jeffrey N Gordon of Codespoti & Associates, P.C.on behalf of Elvira Kovshov to legalize the construction of a stonewall and to correct drainage and erosion deficiencies. Portions of the work are within the wetland, the upland review area and the WPLO area of an unnamed stream.
3. 4 Tanglewood Lane: Request by Pamela Davis for release of remaining bond monies held for plantings as a condition of Permit #IWW, WPL/E-8229-07.
4. 57 Partrick Rd.: Request by Eugene Cedarbaum to eliminate Condition 18 of Resolution #IWW,WPL/E-8496-09 that required the driveway remain permeable with said restriction to be placed on the land records and a request to release the bond monies being held for plantings and sediment and erosion controls.
5. 11 Great Marsh Road: Application #WPL-8889-11 by Land-Tech Consultant, Inc. on behalf of David Korus for an excavation and fill permit. The site is wholly with the WPLO area and the 25-year floodplain of the Saugatuck River.
6. 92 Harbor Road: Application #WPL-8858-11 by Keith B Neilson, PE of Docko, Inc. on behalf of William Cohen to remove the existing wood pier and construct a 20 (+/-) LF of 4’ wide fixed wood pile or post-supported timber pier with wood and grate deck, install a new 8’ by 12.5’ float with associated ramp and restraint pilings waterward of the high tide line. Work is entirely within the WPLO area, the 25-year and the 100-year floodplains of the Saugatuck River.
7. 157 Riverside Avenue: Application #WPL-8891-11 by Barr Associates, LLC on behalf of Robert Gerber for a new single-family residence, patio, a/c units, driveway and drainage. Portions of the work are within the WPLO area and the 25-year floodplain of the Saugatuck River.
Members will meet at the Conservation Department first to carpool. Some sites might be especially wet so appropriate clothing and footwear is recommended. Tick repellant is also encouraged.
Posted with the Town Clerk’s Office on Wednesday, September 14, 2011 Field trip notice 9.19.11