WESTPORT, CONNECTICUT
FLOOD & EROSION CONTROL BOARD
TOWN HALL, 110 MYRTLE AVENUE
WESTPORT, CONNECTICUT 06880
(203) 341-1120
LEGAL NOTICE OF DECISION
Notice is hereby given that at a meeting held on April 4, 2018, the Westport Flood & Erosion Control Board took the following actions:
1.24 Spriteview Avenue / Application WPL #10553-18; APPROVED; Application of Andy Soumelidis of LANDTECH, on behalf of the owner, Peter C. Greer and Deena R. Greer, for the construction of a new masonry landing to access a FEMA compliant dwelling within the WPLO. The proposed activity is within the WPL area for the Saugatuck River.
2.286 Compo Road South/ Application WPL #10567-18; CONTINUED; Application of William Green and Linda Durakis for driveway improvements and parking area expansion within the WPLO. The proposed activity is within the WPL area for the Saugatuck River.
3.9 Owenoke Park/ Application WPL #10568-18; APPROVED WITH CONDITIONS; Application of Barr Associates, LLC, on behalf of the owner, Bluewater Owenoke, LLC, for the reconstruction of an existing seawall, and replacement of an existing concrete stairway within the WPLO. The proposed activity is within the WPL area for the Saugatuck River.
4.26 Morningside Drive South/ Application WPL #10569-18; APPROVED WITH CONDITIONS; Application of Barr Associates, LLC, on behalf of the owner, Morningside Drive Homes, LLC, for the subdivision of one 2.37-acre parcel into 3 individual parcels within the WPLO. The proposed activity is within the WPL area for Muddy Brook.
5.16 Manitou Road/ Application WPL #10571-18; APPROVED WITH CONDITIONS; Application of Alana Fuscaldo for the construction of a new single family residence with attached garage, new driveway, new septic system, stormwater drainage, and other site appurtenances within the WPLO. The proposed activity is within the WPL area for the Saugatuck River.
6.60 Compo Beach Road/ Application WPL #10570-18; APPROVED WITH CONDITIONS; Application of Jennifer A. Fava, Town of Westport Director of Parks and Recreation, for the construction of a new restroom, storage building, concrete walks, and timber guard rail within the WPLO. The proposed activity is within the WPL area for the Saugatuck River.
I.WORK SESSION
1.Upon completion of the PUBLIC HEARING session above, the public is invited to observe, but may not participate, while the Flood & Erosion Control Board discusses the above listed applications.
Applications, plans, and decisions may be examined in the Public Works Office, Room 210, Town Hall, 110 Myrtle Avenue, Monday through Friday, 8:30 am to 4:30 pm.
Preston Koster, Acting Chair
Flood & Erosion Control Board
[NOT TO PUBLISH BELOW HERE]
TO BE PUBLISHED IN THE April 13, 2018 EDITION OF THE WESTPORT NEWS