Regularly Scheduled Meetings

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print
Dates of Scheduled and Announced meetings in 2020 can be found in the calendar under All Upcoming meetings for the selected group.
How to See Upcoming Meetings

P & Z Commission Public Hearing Agenda

  • Date: 06/02/2011 7:00 PM  
  • Location: Town Hall
    Connecticut

Notice is hereby given that the Westport Planning and Zoning Commission will hold a Public Hearing on Thursday, June 2, 2011, at 7:00 P.M. in Town Hall, 110 Myrtle Avenue to hear the following:

1. Amendment #626: Appl. #11-004 by the Planning and Zoning Commission for an amendment to the Westport Zoning Regulations to modify §32-8, Excavation and Filling of Land to clarify that items that are not exempt are subject to Site Plan and/or Special Permit approval and that all exempt and non-exempt activities must conform to the standards listed in §32-8.3; §32-8.1, Exemptions To add that even exempt activities are subject to the standards in §32-8.3; §32-8.1.1, to modify to limit exemptions to within 15 feet from any building or structure only for work approved as part of a zoning permit; §32-8.1.2, to modify to include Site Plan & Special Permit applications in the list of exemptions; §32-8.1.3, to delete the word ‘fence’ and to modify to limit exemptions to within 15 feet from the work that is subject of the zoning permit; §32-8.1.4, to modify to include changes in groundwater patterns as an activity that is not exempt. Also, modified to recognize additional enforcement mechanisms are now available, §32-8.1.5; to add a section that allows the Planning & Zoning Director to grant exemptions from the 15 foot limitation in §32-8.1.1 and §32-8.1.3, when the need to exceed this standard is minor in nature; §32-8.2, Excessive Fill Regulations, to add Excavation; §32-8.2.1 (a), to modify to include both excavation and fill. The lot area restriction is changed from 8,000 SF to 10,000 SF and the maximum excavation or fill amount is to be reduced by 50%. This section covers residential zoning districts; §32-8.2.1 (b), to modify to include both excavation and fill. The lot area restriction is changed from 8,000 SF to 10,000 SF and the maximum excavation or fill amount is to be reduced by 50%. This section covers non-residential districts; §32-8.2.1 (c), to modify to include both excavation and fill. The lot area restriction is changed from 8,000 SF to 10,000 SF and the maximum excavation or fill amount is capped at 500 cubic yards for smaller lots. This section covers both residential and non-residential districts; §32-8.2.2, to modify to include both excavation and fill. This formula reduces all allowable excavation or fill by 50%; §32-8.2.3, to modify to include both excavation and fill in the height calculations; §32-8.2.6, to modify to include both excavation and fill in the total maximum excavation and fill calculations and requires the use of total excavation not net change; §32-8.2.7, to modify to recognize the Town’s new GIS system and the change to the new NAVD 88 datum; §32-8, Standards; §32-8.3.2 to modify to reduce the allowable man made earth slopes from 20 degrees to 14 degrees (from 2.75 horizontal to 1.0 vertical slope) changed to (4.0 horizontal to 1.0 vertical slope) within 25 feet of the property line and a new added requirement that these slopes are not permitted within any required setback which ever is less. The slopes over the remaining portions of the property are reduced from 30 degrees to 20 degrees (from 2 horizontal to 1.0 vertical slope) changed to (2.75 horizontal to 1.0 vertical slope). There can be no grading or slope changes within 5 feet of any property line; §32-8.3.4, to modify to state that processing of earth materials is prohibited except for material that is excavated directly from the site; §32-8.3.5, to delete section about no permanent buildings on-site; §32-8.3.9 to add new section to prohibit the use of fill that contains organic material or petroleum based products; §32-8.3.10, to add new section to require erosion controls be installed pursuant to §37; §32-8.5, Considerations Affecting Approval to delete the word ‘Commission’ and ‘shall be given to protecting’; §32-8.5.1, to modify to eliminate the P&Z Commission as ARC may also be allowed to apply these standards; §32-8.5.1 to modify to eliminate the P&Z Commission as ARC may also be allowed to apply these standards; §32-8.5.4 (f), to modify to eliminate the P&Z Commission as ARC may now also be allowed to require a bond; §32-8.5.4 (g), to add a new section that allows for the hiring of a site monitor to be paid for at the applicant’s expense; §32-8.6, Administrative Excavation/Fill Permit to add the word ‘either’; §32-8.6, to modify to specify that either a disturbance of 5,000 SF or an excavation/fill change of 1,000 cubic yards requires a Special Permit; §32-8.6.4 to modify the requirement for mailing of notices to be consistent with §44-1.2.

At this meeting interested persons may be heard and written communications received. The file may be examined in the Planning and Zoning Office, Room 203, Town Hall, 110 Myrtle Avenue, Monday, Wednesday and Friday, 8:30 A.M. to 3:00 P.M. and Tuesday and Thursday 8:30 A.M. to 4:30 P.M.
Dated at Westport, Connecticut this 20th and 27th day of May, 2011
Ron Corwin, Chairman, P&Z Commission

To be inserted in
The Westport News
On: May 20 and May 27, 2011
Friday



Return to full list >>

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer